Skip to main content
Return to the list of products

POWERLIFT 6S - Gas spring

Ouvrants
New
POWERLIFT 6S - Gas spring (1)
POMMIER

Gas spring

Log in

To check prices, availability and make a pre-order

Logo NEMO

Which products should you choose according to your needs?

Reference Drawings
510511824N1500
510511824N2000
510511824N2500
510511824N3000
Reference
Drawings
510511824N1500
Reference
Drawings
510511824N2000
Reference
Drawings
510511824N2500
Reference
Drawings
510511824N3000

Frequently asked questions

  • Rails must be installed on the body ceiling using M8x40 screws respecting a maximum distance of 600 mm between each fixing point and according to the specification of our fitting instruction n° 0052.